Install the shingles suitable up to the front wall. Cut several inches from the vertical part of the dormer flashing, and operate the horizontal portion previous the side wall that same length. Nail the dormer flashing to the two the wall as well as the shingles. Hip roof: Should you https://succeedinlife.co.uk/telephone-answering-service-by-paperclip/